Skip to main content
CENTURY SENYUAN

Compact Substations

YB Series Prefabricated Substation

YB-12/0.4 prefabricated substation (YB□-12/0.4) for 3.6–12 kV three-phase AC systems, integrating medium-voltage switchgear, distribution transformer, and low-voltage switchgear in a single factory-assembled enclosure. Engineered for power utilities, mining, building-materials plants, transport hubs, municipal infrastructure, and emerging applications such as large engineering-machinery power supply and photovoltaic generation. Supports all mainstream MV/LV equipment, accepts customized electrical schemes, and is energization-ready to cut on-site civil works and installation time. Manufactured to GB 17467, GB/T 11022, DL/T 537, IEC 62271-1, and IEC 62271-202.

YB Series Prefabricated Substation product image from the supplied SJSY official catalog

Quick answer

Engineering selection summary

YB Series Prefabricated Substation is an RFQ-configured compact substations for Industrial parks and Commercial centers. Confirm five inputs before quotation: voltage class, rated current, single-line diagram, installation environment, and destination standard.

Model
YB / S / P / S
Standard family
IEC 62271-202 / GB 17467 family, verify by product and project scope
Application scenarios
4 documented uses
RFQ minimum
5 engineering inputs

Verified Technical Specifications

Visible specifications and Product structured data use the same reviewed fact set.

Model Number
YB / S / P / S
HS Code
RFQ required
Standard Compliance
IEC 62271-202 / GB 17467 family, verify by product and project scope
Product Category
Compact Substations
Rated Voltage
3.6-12 kV
Rated Frequency
50 Hz
Applicable Standards
IEC 62271-202, GB 17467

Technical specification evidence

Product Advantages

  • Structured from the supplied SJSY official product catalog dataset
  • Prepared for engineering RFQ instead of online checkout
  • Can be configured against buyer drawings, voltage class, site conditions, and project standards
  • Suitable for quotation review with SLD drawings and technical specifications

Application Scenarios

  • Industrial parks
  • Commercial centers
  • Outdoor distribution
  • Photovoltaic and infrastructure power supply

Factory Manufacturing Process

  1. Step 1

    Engineering drawing review

  2. Step 2

    Cabinet fabrication and assembly

  3. Step 3

    Electrical testing and FAT

  4. Step 4

    Export packing and loading

Product FAQ

Can YB Series Prefabricated Substation be quoted for an overseas project?

Yes. Submit the project SLD, voltage class, rated current, installation environment, destination country, and preferred component ecosystem so the engineering team can review the quotation scope.

Why does this source catalog page not show a public price?

Industrial electrical equipment is configured by project drawings, electrical parameters, component brands, testing requirements, packing, and delivery terms. The site uses RFQ instead of checkout or public pricing.

Are source images and source IDs preserved?

The source product ID, category, source URL, and image URL are preserved for traceability. Public claims remain limited to supplied source material and RFQ-ready product descriptions.

What information is required for an engineering quotation?

Provide five core inputs: voltage class, rated current, single-line diagram, installation environment, and destination standard. Component preferences, quantities, delivery terms, and testing requirements improve quotation accuracy.

How should buyers verify standards compliance before ordering?

Use IEC 62271-202 / GB 17467 family, verify by product and project scope as the initial standard family, then confirm the exact model scope, destination requirements, technical agreement, type-test evidence, and FAT plan with the engineering team before production.

Inquiry CTA

Upload SLD drawings or secondary schematics to receive an engineering-grade quotation.

product-inline-yb-series-prefabricated-substation-5

Loading engineering RFQ form...